The RDR Phase 3 Bridge, which will be the longest curved multi span bridge over land in England, is due to commence installation in early Autumn 2022 and will open in Summer 2023.
The RDR Phase 3 Bridge, which will be the longest curved multi span bridge over land in England, is due to commence installation in early Autumn 2022 and will open in Summer 2023.